UNDERWATER CONSTRUCTION & ENGINEERING-MARINE OUTFALL REPAIRS

Outfall-Pipe-Repairs-2

Project Details

Project:
Wexford Waste Water Treatment Plant Outfall repairs

Client:
Murphy International Ltd

Works:        

Date:
July- October 2018

Description

The works consisted of:

  • Excavation of area around diffuser and outfall pipe using air lift system and barge mounted excavator
  • Various repairs to damage & breaks in the existing outfall pipe
  • Installation of band clamps to damaged sections of the outfall pipe
  • Concrete installation around the repaired sections of the outfall pipe
  • Excavation and realignment of intertidal sections of the outfall
  • Removal, refurbishment and reinstallation of 10no diffusers

Marine Specialists Equipment

  • 9 no Nato type pontoons pontoons
  • Barge mounted knuckle boom crane
  • Barge based 360° excavator
  • Mini Tug vessel – Marine Bravo
  • Support RIB Marine Alpha
  • Barge based containerised Dive Control

Notes

The project proved a challenge for the dive team principally due to the poor visibility on site. The lack of visibility arose due to the site location, outfall pipe discharge and the nature of the works (excavations using an airlift and concrete pouring to stabilise the seabed for the repair clamps).